back

GenCo 2025

Background and Objectives

  • A leading European energy generator asked innogy Consulting to develop a target organisational setup for the year 2025
  • Together with a multidisciplinary working group of experts of the relevant divisions and functions we developed a target design covering the dimensions steering model, (de-)centralization of functions (technical, commercial, management & support, etc.), target dimensioning (FTEs, shift logic, make or buy)

Approach

  • Definition of frame: Structure and size of the generation portfolio in 2025 (in MW), design principles and rules of cooperation for the working group
  • AS-IS analysis: Description of the steering logic and KPIs, mapping of the AS-IS organisational setup, mapping of the current functions (AS-IS FTE, shift logic) incl. involved areas beyond the core functions
  • Workshop series with the working group: Introduction and objectives, elaboration on initial inputs in break out groups, synthesis of results, discussion and iteration of results based on new insights
  • Summary of results to descriptions of archetypal organisational setups for the board of directors

Results

  • Detailed organisational structure accounting for regional specifics, incl. recommendations for centralisation and outsourcing of functions
  • Description of the steering logic and KPIs as well as interface to other involved business units (group center, wholesale power trading)
  • Indicative target dimensioning of FTEs based on internal and external benchmarks
  • Evaluation of the strengths and weaknesses of each option and final recommendation
Integrating renewables trading
Digitalization in Renewables

Your point of contact for
GenCo 2025

Mirco Glunz
Partner Contact us now: